3 roller plate bending machine

The startup inspection of the 3 roller plate bending machine is crucial to ensure the normal operation of the equipment and the safety of the operators.The following are the specific steps and precautions for the start-up inspection of the 3 roller plate bending machine:
1、Equipment inspection

After connecting the power,first let the lower roller move in both directions to check if it runs smoothly and without any abnormal noise.At the same time,make the upper roller move up and down to check for any jamming or poor operation.Check for any abnormalities in all components,especially ensuring that the fastening screws(caps)are not loose.The brake should be normal and reliable,ensuring quick braking in emergency situations.Check the lubrication condition of the equipment and add lubricating oil to other parts according to the markings on the lubrication table.The lubricating oil used should be of good quality and free of sediment to ensure the lubrication effect during equipment operation.

3 roller plate bending machine

2、Preparation of operating environment
When using a crane to lift steel plates or drums,it is necessary to ensure that there is no collision with the 3 roller plate bending machine to avoid damaging the equipment or causing safety hazards.The area around the 3 roller plate bending machine should be kept clean and free of debris to avoid affecting the normal operation of the equipment or causing accidents such as tripping of operators.
3、Safety precautions
During the rolling process,hands must not be placed on the rolled steel plate,and samples are not allowed to be used for inspection.After stopping the machine,use a template to check the roundness to prevent accidents.The workpiece must be placed steadily and in the correct position before it can be driven for operation,and clear signals should be provided.A designated person should be assigned to command to ensure coordinated and consistent operation.When rolling narrow simplified characters,they should be placed in the middle of the rolling mill to prevent hands and clothes from being rolled into the rolling mill.
4、Shutdown and maintenance
If any abnormal noise is found during the operation of the machine tool,it should be stopped immediately for inspection,adjustment,and repair to prevent the fault from expanding.After shutdown,the workpiece should be placed in the designated location and the equipment power should be turned off to ensure safety.Regularly maintain and upkeep the equipment,including checking the wear and tear of the V-belt,handle,knob,buttons,etc.If there is severe wear,it should be replaced in a timely manner.After shutdown,it is necessary to add lubricating oil to the machine tool and wipe it clean to avoid rust and dust accumulation.
In summary,the startup inspection of the 3 roller plate bending machine involves multiple aspects such as equipment inspection,preparation of operating environment,safety precautions,and shutdown and maintenance.Only through comprehensive and meticulous inspection and preparation can the normal operation of the 3 roller plate bending machine and the safety of the operators be ensured.
Previous : No more
Next: Cone roller machine manufacturer
Contact
 Address:Room 1202, Detaitang Building, No. 118 Huaguang Road, Zhangdian District, Zibo, Shandong
 WhatsApp:+8615653328535
 Wechat: +8615965331535
 E-mail:zs@sdsmachinery.com
日韩精品中文字幕无码一区 | 国产娱乐凹凸视觉盛宴在线视频| 国产成人一区二区三区免费| 免费四影虎ww4hu10| 成aⅴ人免费观看中文字幕| 亚洲av无码国产精品色午夜软件| 国产精品55夜色66夜色| 伊人久久大香线蕉无码不卡| 枣阳市| 国产欧美精品区一区二区三区| 另类另类另类另类性| 97在线免费观看视频| 久久情| 欧美高清性xxxxhd| 少妇高潮zzzzzzz| 激情欧美一区二区三区| 日韩精品系列| 日本精品人妻| 精品综合网| 少妇极品熟妇人妻专区视频| 日韩一区二区三区在线视频 | 人妻少妇精品专区性色AV| 久久婷婷国产剧情内射白浆| 沈阳45老熟女高潮喷水亮点| 中文字幕乱码亚洲无线码| 自愉自愉产区二十四区| 大香线蕉伊人精品超碰| 老少配老妇老熟女中文普通话| 无码任你躁久久久久久| 欧美精品视频一区二区三区| 精品人妻无码专区中文字幕| 天天影视网色香欲综合网| 中文无码AV电影在线观看网站| 波多野结衣高潮av在线播放| 精品无码成人片一区二区| 国产成人亚洲精品狼色在线| 精品乱码久久久久久久| 中文字幕乱码人妻一区二区三区| 青青青国产在线观看免费 | 人妻影音先锋啪啪AV资源| 久久久久人妻精品一区二区三区|